Skip navigation

Category Archives: Lee A Tregurtha

This was the second time we had the good fortune to be at Frasier Shipyards when tugs were working to break out the ships from winter layup. We had planed to drive over to Frasier Shipyards to take a few photos of the ships that were in winter layup and in for repair. When we arrived we discovered that a tug was working to free the ships from the ice so they could begin the shipping season. The Kaye E. Barker had already been freed from the ice

The Tug North Carolina was working to freeĀ  the Lee A. Tregurtha.

The Tim S. Dool was in Frasier for major overhaul,

The William A. Irvin was moved to Frasier from its dock in Duluth last fall for a much needed refurbishing. It is a major tourist attraction in Duluth.

One last shot of the ships as the tug was finishing its work.

There are a number of Great Lakes Ships in Superior for winter layup. The shipping season usually ends in mid January and resumes again around the third week in March. As you can see most of the ships are being worked on while they are in port for winter layup.

Burns Harbor

Burns Harbor At Lakehead Pipeline

Lee A. Tregurtha

Lee A. Tregurtha At Fraser Shipyards

Herbert C Jackson

Herbert C JacksonAt Fraser Shipyards

Paul R Tregurtha

Paul R Tregurtha At Midwest Energy